Ospedale del Mare - Naples

Constructive design and construction of pedestrian walkway Preili entirely tubular.

Purchaser
Impresa Astaldi
Designer
Ing. De Risi
Location
Napoli
Construction Year
2010
Technical Specifications
The walkway 90 m long was made entirely of tubular profiles. Given the lack of access from below the railway line, was put in place with one using a crane to lift 850 tons.