Ospedale del Mare - Naples
Constructive design and construction of pedestrian walkway Preili entirely tubular.
- Purchaser
- Impresa Astaldi
- Designer
- Ing. De Risi
- Location
- Napoli
- Construction Year
- 2010
- Technical Specifications
- The walkway 90 m long was made entirely of tubular profiles. Given the lack of access from below the railway line, was put in place with one using a crane to lift 850 tons.