Variante di Codigoro ( Fe )

Construction and installation of bridges and fly Baccarini. Arc tubular.

Purchaser
Impresa Alissa
Designer
Ing. Mario Organte
Location
Codigoro (FE)
Construction Year
2006
Technical Specifications
70m maximum light. The launching of the bridge Baccarini was organized by assembling the entire structure deck, bow, hangers and bracing than on steel skids, in srguito was pushed from the bank toward the opposite shoulder. The avambecco which is usually fitted to this type of launch, it was not necessary because the structure, arrived about half of the river, was supported by a crane and attaching to the shoulder support. For the launch of the struts are mounted to hangers across interim project.